TSX.V: ELY   $0.10

News Releases

 
Dec 10, 2012
Solitario and Ely Gold Intersects 125 Feet Grading 2.16 Grams Per Tonne Gold Equivalent On Its MT. Hamilton Gold Project, Nevada
Denver, Colorado: Solitario Exploration & Royalty Corp. ("Solitario;" NYSE MKT: XPL; TSX: SLR) and Ely Gold & Minerals ("Ely Gold;" TSX.V: ELY) are pleased to announce assay results for 25 new drill holes on its recently completed 2012 Mt. Hamilton drilling program. Eight of the holes were drilled within the vicinity of the Centennial ore body and 17 holes were drilled in the Seligman deposit area.

Highlights of this round of drilling results are presented in the Table below. Results from the last 25 drill holes are appended to this release. Drill hole location maps for both the Centennial and Seligman deposits can be accessed at:

www.solitarioxr.com/art/Seligman2012DHs,revisedlogo,5Nov2012-finalMap.jpg

Drill Hole (Deposit)
(C)=Centennial; (S)=Seligman
From
To
Interval*
Gold
Silver
Gold Eq.***
(feet)
(feet)
(feet)/(m)
(gpt)
(gpt)
(g/tn)
MH-12-07 (C)
340
460
120 / 36.6
1.46
11.44
1.67
MH-12-10 (C)
425
550
125 / 38.1
1.82
18.54
2.16
MH-12-18 (C)
575
635
60 / 18.3
1.00
24.25
1.44
MH-12-30 (S)**
4.2
34.4
30.2 / 9.2
1.64
1.35
1.66
MH-12-35 (S)**
259.0
372.2
113.2 / 34.5
0.74
3.2
0.80
MH-12-43 (C)**
589.30
615.0
25.7 / 7.8
0.83
135.03
3.29
MH-12-47 (C)**
574.5
601.0
26.5 / 8.1
3.61
15.54
3.89
MH-12-48 (S)
305
380
75 / 22.9
0.63
19.56
0.99
MH-12-49 (S)
320
385
65 / 19.8
1.12
7.21
1.25
MH-12-51 (S)
265
355
90 / 27.4
0.95
10.77
1.15
*True width is estimated to be approximately 80% of true width for most intervals
**Core hole; all other reported holes in this chart are reverse circulation drill hole
*** Gold Equivalent = gold grade + (silver grade ÷ 55)


In total, 42 reverse circulation drill holes and 11 core holes were recently completed totaling 16,615 feet and 3,969 feet of drilling, respectively. Assay results for the last two Seligman core holes are expected before year's end. On September 10, 2012, Solitario announced its initial NI-43-101 resource estimate for the Seligman deposit. The 53-hole 2012 drilling campaign was designed to achieve several objectives. The main focus was to convert Seligman inferred resources in specific areas to measured and indicated categories. Other objectives included obtaining sample material to carry-out metallurgical and geochemical testing and to measure geotechnical characteristics for mine planning at Seligman. Several holes were also drilled at the Centennial gold deposit to convert inferred resources to measured and indicated categories as well as to test potential extensions of mineralization to the south. The Centennial deposit was the subject of a Feasibility Study issued earlier this year (http://www.solitarioresources.com/news/022712.pdf).

Chris Herald, President and CEO of Solitario commented, "With the successful completion of our 2012 drilling program, together with the filing of our Mt. Hamilton Plan of Operations last week, we will now focus our attention on managing the permitting process, as well as completing the technical studies required to fully evaluate Seligman economics." Trey Wasser, Ely Gold's President & CEO, commented, "Solitario continues to complete important milestones required to bring the Mt. Hamilton project to construction, and ultimately production."

Qualified Person

The drill hole information contained within this release is reported under a quality control program supervised by Mr. Walt Hunt, Chief Operating Officer for Solitario, who is a qualified person as defined by National Instrument 43-101. He has verified the drill results and other data disclosed in this new release, including sampling, analytical and test data. Samples are derived from 50% splits of HQ and NQ (2.5 and 1.9 inch) diameter core. Samples are then shipped via secured third-party land transportation and analyzed by American Assay Laboratories, Reno, Nevada, an ISO9001:2000 registered company. In addition to the laboratory's quality control program, a check assay program is ongoing.

Terms of the Mt. Hamilton LLC Joint Venture

Solitario and Ely Gold formed the Mt. Hamilton LLC ("MH-LLC"), a limited liability company which holds 100% of the Mt. Hamilton project assets under an Operating Agreement ("MH-Agreement"). Per the terms of the MH-Agreement, DHI-US, Ely Gold's wholly owned US subsidiary, has a 20% interest in the MH-LLC and Solitario has an 80% interest.

About Solitario

Solitario is a gold, silver, platinum-palladium, and base metal exploration and royalty company actively exploring in Brazil, Mexico, Peru and Nevada. Solitario has significant business relationships with Votorantim Metais and Anglo Platinum. Solitario is traded on the NYSE MKT ("XPL") and on the Toronto Stock Exchange ("SLR"). Additional information about Solitario is available online at www.solitarioxr.com .

About Ely Gold

Ely Gold is focused on the acquisition and development of gold resources in North America. Ely Gold is traded on the TSX Venture Exchange ("ELY"). Additional information about Ely Gold is available online at www.elygoldandminerals.com.

FOR MORE INFORMATION AT SOLITARIO, CONTACT:

Debbie Mino-Austin
Director -- Investor Relations
(800) 229-6827

Christopher E. Herald
President & CEO
(303) 534-1030

FOR MORE INFORMATION AT ELY GOLD, CONTACT:

Steve Kenwood
Director
(604) 488-1104

Trey Wasser
President & CEO
972-803-3087


This press release includes certain "Forward-Looking Statements" within the meaning of section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding potential mineralization and reserves, exploration results and future plans and objectives of Solitario, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Development of Solitario's properties are subject to the success of exploration, completion and implementation of an economically viable mining plan, obtaining the necessary permits and approvals from various regulatory authorities, compliance with operating parameters established by such authorities and political risks such as higher tax and royalty rates, foreign ownership controls and our ability to finance in countries that may become politically unstable. Important factors that could cause actual results to differ materially from Solitario's expectations are disclosed under the heading "Risk Factors" and elsewhere in Solitario's documents filed from time to time with Canadian Securities Commissions and the United States Securities and Exchange Commission.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


2012 Seligman Drilling Results:  Phase 2 (latest 25 drill holes)
Drill Hole (Deposit)
(C)=Centennial;
(S)=Seligman
Mineralized
Interval - feet
Drill Thickness*
feet / meters
Gold Grade
gr./tonne
Silver Grade
gr./tonne
Gold Equiv.
gr./tonne***
MH-12-01 (C)
510-585
75 / 22.9
0.24
12.32
0.46
MH-12-05 (C)
510-585
75 / 22.9
0.17
10.29
0.36
MH-12-07 (C)
340-460
120 / 36.6
1.46
11.44
1.67
505-590
85 / 25.9
0.34
1.85
0.37
MH-12-10 (C)
425-550
125 / 38.1
1.82
18.54
2.16
MH-12-17 (C)**
20.2-37.1
16.9 / 5.2
0.44
11.69
0.65
77.6-140.9
63.3 / 19.3
0.29
8.84
0.45
159.3-217.4
58.1 / 17.7
0.86
11.30
1.07
254.2-317.2
63.0 / 19.2
0.22
9.77
0.40
MH-12-18 (C)
575-635
60 / 18.3
1.00
24.25
1.44
MH-12-24 (S)**
66.0-85.1
19.1 / 5.8
0.76
1.97
0.80
MH-12-30 (S)**
4.2-34.4
30.2 / 9.2
1.64
1.35
1.66
67.2-83.5
16.3 / 5.0
0.22
15.59
0.50
MH-12-34 (S)**
206.0-246.6
40.6 / 12.4
0.59
3.79
0.66
205-245
40 / 12.2
0.47
12.53
0.70
265-315
50 / 15.2
0.45
7.50
0.59
MH-12-35 (S)**
259-372.2
113.2 / 34.4
0.74
3.20
0.80
285.4-298.0
12.6 / 3.8
1.38
5.13
1.47
318.5-348.8
30.3 / 9.2
1.40
8.28
1.55
MH-12-36 (S)
370-380
10 / 3.0
0.98
33.45
1.59
MH-12-38 (S)
315-335
20 / 6.1
0.52
0.78
0.53
380-460
80 / 24.4
0.34
2.48
0.39
520-540
20 / 6.1
1.58
11.13
1.78
MH-12-39 (S)
370-390
20 / 6.1
0.26
2.70
0.31
MH-12-41 (S)
340-360
20 / 6.1
0.48
2.33
0.52
MH-12-42 (S)
355-380
25 / 7.6
1.42
27.2
1.91
MH-12-43 (C)**
589.3-615.0
25.7 / 7.8
0.83
135.0
3.29
713.0-723.0
10.0 / 3.0
0.61
19.6
0.97
MH-12-44 (S)
400-440
40 / 12.2
0.73
10.71
0.92
MH-12-45 (S)
175-195
20 / 6.1
0.31
5.08
0.40
265-300
35 / 10.7
0.46
4.39
0.54
420-440
20 / 6.1
3.03
1.78
3.06
MH-12-46 (S)
145-165
20 / 6.1
0.38
0.38
0.39
195-220
25 / 7.6
0.25
1.74
0.28
305-335
30 / 9.1
0.66
6.33
0.78
MH-12-47 (C)**
478.3-502.0
23.7 / 7.2
0.19
94.80
1.91
574.5-601.0
26.5 / 8.1
3.61
15.54
3.89
651.0-670.4
19.4 / 5.9
0.09
46.42
0.93
MH-12-48 (S)
305-380
75 / 22.9
0.63
19.56
0.99
MH-12-49 (S)
165-190
25 / 7.6
0.49
3.46
0.55
320-385
65 / 19.8
1.12
7.21
1.25
MH-12-51 (S)
265-355
90 / 27.4
0.95
10.77
1.15
MH-12-52 (S)
285-330
45 / 13.7
1.20
5.82
1.31
395-420
25 / 7.6
0.45
12.48
0.68
MH-12-53 (S)
45-150
105 / 32.0
0.20
5.15
0.29
*True width is estimated to be approximately 80% of drill thickness for most intervals
**Core holes; all other reported holes in this chart are reverse circulation drill holes
***Gold Equivalent = gold grade + (silver grade ÷ 55)
 
 

You can view the Next News Releases item: Tue Jan 15, 2013, Solitario and Ely Gold Receives $4.0 Million Payment From Sandstorm And Updates Activities On Its MT. Hamilton Gold Project, Nevada

You can view the Previous News Releases item: Mon Nov 26, 2012, Solitario and Ely Gold Files Plan Of Operations On Its Mt. Hamilton Gold Project, Nevada

You can return to the main News Releases page, or press the Back button on your browser.